I have 4 of the 6 strands done. The temp is finally under 90, but I will try to get the last 2 done tomorrow. I will still need to tighten all 6 of them, but at least they will hold till then.
Month: June 2012
Gate is done
The gate is done. It is operational but like most sags and needs to be lifted.
When it cools down a little I will start on cutting wire and anchoring it to itself.
Gate
Second side bar is welded in place. Just need to weld angle irons and hang gate. Then cut wire and tie them off and it will be finished. I hope to finish it tomorrow.
One done
I prepared for working on the gate posts and started at about 9am. It took about an hour for the prep. It was another to cut one top rail and weld it in place by 11am. That makes one done and one to go. I will take care of the second one once the sun begins to set.
Power
Progress today. The paperwork for the power company has been filled out and is ready for the mail.
Also got the serial numbers on the rebate form and it is ready for the mail.
Free premium Chanels this weekend. This made me realize we should be able to get the dish everything down the road and by splitting it 3 ways we should need to pay about $30. Hell that is less than basic and getting everything.