The call went in to the soil engineer and it is scheduled for Monday the 27th.
I sent in a request for a quote on the doors last night and now I am looking for windows.
Plumbing, electric and HVAC appear to in the plan so i may Beanie to move forward on that also.
I have notheard back from the septic guy with his quote and I have not called the Geo heat pump company yet.
All in all I feel we are moving forward.
Category: New House
Documentary of building the house
Exterior update
Along with these updated external images I also found out that the only permit I need is a septic tank inspection. No other permits or anything are needed! Yep, strange but true. We wil still need to get the appraiser out after it is done. I am thrilled about skipping all the red tape. We will still have it done as if permits and inspections were needed.
Outside Images
Floor Plan Views
Here are some PDFs of the Plans:
Main Floor Plan
Landscaping Floor Plan
Plumbing Floor Plan
Electrical Floor Plan
Detail Floor Plan
Main parts of the Floor Plan
ALL Layer Floor Plan
Totally different day
I didn’t so what had planned!
I worked on the floor plan for a few more hours. Then I went out an put in T Posts where each corner will be to see what it will look like on the land. I need to have the power pole moved due to the actual location of the house.
I did a rough Photoshop of where the house will be.
.
I worked on estimating for the fencing and then have been working on the plans again.
I will try to get some of the insides and outer shots posted soon