I rescheduled the Power company to come out tomorrow and look at the project. they should be here about 10 am. Then we go get the new contacts and head over to Home depot for Door and window quotes.
Category: New House
Documentary of building the house
House progress
Today I received the first of the quotes. It was for the doors. We also contacted a roofing company for a meeting and then a quote.
Picked up the fish. There is no way there was 100 fish in the bag!! We also had a much higher death rate this round. We hope the purchasing is over and the fish do their job! We will see. 🙂
Another one down
Today is coming to an end. So another one down and two to go. 🙂
I called the folks today and we had a good visit. Then when we got home I ate leftover chicken and sauerkraut. Not much tops rotten cabbage. 🙂 Not sure why, but we definitely love it.
Then I took a break and watched some TV.
I sent out a few emails for the house and the builder responds that he has a few foundation crews. We would like one of his crews as they should be accustomed to the concrete home setup. I looked over the soil sample papers and we should have word by the 26th and then it goes to the foundation engineer.
Once the foundation engineer us done things should start moving along.
Ahhh. I so look forward to actually seeing progress.
Doors
The email arrived at ETO Doors and they called to verify what I was requesting.
I think the interior will be done at Home depot. I will make a decision on the others after his quote. I know that Home Depot has all the doors that Susan liked so we do have a fail safe. 🙂
Soil Sample
Well they arrived a little after 9 AM and just left. The guys told me that they had water in the soil at 16 feet. I am not sure that is good , but I am guessing not. I guess all we do now is wait to see the report and then get the foundation designer.