With the rain outside and the septic in the fritz we agreed not to lay the shower pebble floor.
Day: March 2, 2014
Septic
What a wonderful day. The toilet appears to be backing up, but it turns out it is something wwith te septic system. I opened up the cleanout tube and water came out. I opened up the grey water line and water came out. I am unable to turn off the grey to black as the box shifted and I cannot turn off the connecting valve. If I could shut off the switch I may be able to better to identify the issue.
I called the septic installer for help. He said he will be out Monday afternoon or Tuesday.
Seed
Went out this morningand adjusted rain spouts. Then put the grass seed down. It is to rain for the nxt few days so hopefully our timing was right.
A few birds have been around eating some of the seed as we brushed it and did not bury it in.
We will see what we have in 7-14 days.
That was done by 8 am. Now we been procrastinating to lay the stone in the shower. It WILL get get done today.
A few birds have been around eating some of the seed as we brushed it and did not bury it in.
We will see what we have in 7-14 days.
That was done by 8 am. Now we been procrastinating to lay the stone in the shower. It WILL get get done today.