The completed pillars and bench.
Month: September 2013
9
I decided to come in and stop for the day. I should be done this weekend or next and 9 hour days of work on my days off will now be the limit! I have a work plan that looks like this.
finish copper water in plumbing
pressure test then find and fix leaks.
Finish the electrical meter that had to be redone.
Finish the 2 inch water line (repair).
Finish the electrical in the house.
By this point the drywall should be started if not already done.
Cabinets should be in place.
Install the appliances.
Move in!!!
Contract the counter tops installation.
Prime all the drywall
Paint all the ceilings
Paint the rooms and set the fixtures in place
Cover the floors.
of course this order is subject to change. 🙂
finish copper water in plumbing
pressure test then find and fix leaks.
Finish the electrical meter that had to be redone.
Finish the 2 inch water line (repair).
Finish the electrical in the house.
By this point the drywall should be started if not already done.
Cabinets should be in place.
Install the appliances.
Move in!!!
Contract the counter tops installation.
Prime all the drywall
Paint all the ceilings
Paint the rooms and set the fixtures in place
Cover the floors.
of course this order is subject to change. 🙂
Soldering
Did some more soldering and most of the 3/4 pipe is complete.
Trip
Went to fireman's museum yesterday. Along with a botanical garden and historical church / library. The heat was rather warm, and we will head to Orange for their botanical garden today. It is over 200 acres then off to a Budest garden in Port Arthur.
Nothing
I did not do any work at the new house today. Nothing was done and I didn't even go over there.