Well I have all the star foam vertical lines cut for the water and electricity up to about the sill plate on the top. Nama get a song to play finish that off and then the outside should be done. Then I'll move on to the inside to do the same thing
Month: May 2013
Junction
I have most of the light boxes in and all but the bid junction boxes. I sure do love progress. Tomorrow I cut the foam for the electrical; then follow through with cutting the foam for the water.
I need to pick up some more electrical materials, but have ordered most of the plumbing and just waiting on receiving it.
Oh I also worked the ground a little this morning. 🙂
-Michael
Sent via mobile.
I need to pick up some more electrical materials, but have ordered most of the plumbing and just waiting on receiving it.
Oh I also worked the ground a little this morning. 🙂
-Michael
Sent via mobile.
Nothing
I was able to get a little bit of nothing done today. I re did the outlets that I did wrong way and marked the water lines. I also marked where I'll be cutting the foam to the roof for each electrical and water. Then I tried to change the attachments on the tractor but hydraulic line had too much pressure on it so I'll wait till tomorrow morning
Sun
The sun is already on it's way. It is getting light out. I love a sunrise, it gives that feeling of renewal.
Electric
I was able to get most of the electrical done outside. I have foe outlet boxes and just realized I news two more sconces. Main breaker is ready and have the meter socket almost done. Next I can do the water or start cutting for the wire.