The house

The status of the house as my 2 week vacation ends.

The interior framework is about complete.
4 items left.
Stairs switched around (suggested by builder)
utility rooms door from garage moved over (My mistake)
wall extension in our bath and on east gable.

Hope he will build the extra walls for the showers. This is (2) 64 " x 24 " walls one in each shower.
It sounds like he is putting in the upper walkway for me. 🙂

The roof decking is about done. It sound be completed by noon tomorrow.
I have the meter socket in and wired to the main breaker panel. The main is grounded and can be powered at any time.
I have all outside wall wiring complete.
I have the outside wall plumbing complete.
I do need to great stuff a little more to finish filling over some of the wires in the foam that are not full.
I have most of the studs and rpfoam cut for the interior water and wires. Of course I missed some and need to drill and cut then in, but most of it is done.

Well time for b?d so I will cut this short.
LSS…. Progress was made in the last two weeks, but my weekends are full for a while to complete the water and wire pulls in the walls and under the floors so the drywall can be installed. 🙂
-Michael