Posts

Beautiful day today allowed me to work on the posts. I have the two corner posts and the two support posts on the west done.
They have been drilled, pounded down to five foot height and concrete poured. I can weld them tomorrow along with the gate chain.
After cleaning up it was about 5:30. I took a shower and ate supper. Now I am winding down and wondering how much I will hurt later. 🙂

Holes

Been out drilling post holes. It is much easier with moisture in the ground. I have one done. One needs a few more inches. The third needs another 6-12 inches and the fourth another 1218 inches. I hope to put in the posts today also.
I came up with the idea of reusing the old 100 amp meter and post. I will see if I can pull it out. If so i will use it and need to do little work on it. That will save some $$.:-)