Beautiful day today allowed me to work on the posts. I have the two corner posts and the two support posts on the west done. They have been drilled, pounded down to five foot height and concrete poured. I can weld them tomorrow along with the gate chain. After cleaning up it was about 5:30. I took a shower and ate supper. Now I am winding down and wondering how much I will hurt later. 🙂
Been out drilling post holes. It is much easier with moisture in the ground. I have one done. One needs a few more inches. The third needs another 6-12 inches and the fourth another 1218 inches. I hope to put in the posts today also. I came up with the idea of reusing the old 100 amp meter and post. I will see if I can pull it out. If so i will use it and need to do little work on it. That will save some $$.:-)
Well we are getting a little rain. I ran out between showers to do some work on the fence posts. It is going SLOW. I got the reference line in before the first shower and the second time I was able to drill a little over a foot. Only a little over one more to go. Then it will Be on to hole number two. 🙂
Made time to cut the grass today. The first brush pile is out, but the second one is still smoldering. So far it has been a productive day. I did read some work emails that upset me and I really would just put work aside when I leave on Thursdays so I have a more enjoyable weekend.