Headed outside to pound the 8' posts 1' in the bottom of the 2' holes. Then I will be ready for the concrete. Looks like the vertical posts may be done this weekend.
Posts
The heat really slows things down. I went out around 11am and started. I got at the post holes around noon and it took until about 730pm to get the three holes done. Hauled the tools out and started. Took a cool down break, Then went back to work. Then took a cool down. I stopped at 2pm and started back up at 5pm. The holes are about 24 inches deep and 8 inches wide.
Tomorrow I sledge in the posts about a foot and quickcrete them in. Now I am watching Grimm and relaxing. The allergies appear to be less as I wore an allergy mask while working outside and then took a shower when I came in.
I am hoping the allergies are finally on the down swing.
Slept
Well I went to bed about 8ish and feel like I slept better. I need to make an appt with the Doc to make sure the issues are still just allergies. I hope today goes quickly. 😉
foundation plan
Foundation plan was sent today after I sent proof of payment.
sike
I thought I was recovering, sike! After going to bed last night my eyes began to itch and my nose got stuffy. By morning I had dry mouth and my eyes were driving me crazy. The issues lasted all day although I think I am feeling better now. I am going to read a little to help get me tired.