Trenched the water line today with the backhoe. I will level it tomorrow with the pick, shovel and hand held hoe. Then. I will line it with sand and lay the water line back in it.
2 hours
I went out to work on the house at about 9am and worked till a little after noon. I guess it was a little more than 2 hours, but I feel guilty for not working longer on it. I decided it was warm out and I needed a long deserved break. I basically watched TV in the 86 degree house, but nevertheless it was a day off.
Second
Drain vents
I have three of the five drain vents glued downstairs. I also have one of the vents glued upstairs. I think I should finish yet today. I will still need to strap them, but I need to anchor everything yet. 🙂
Pipes
Going to drill the last holes for the vents and glue them tomorrow.