Today has turned into a treasure hunt for lights instead of working on the preparation for spraying foam.
Mower
Just took off the backhoe and it is mostly in the garage. Then I put in the mower and came in to say goodnight to my wife. Now I am reading the manual and hope to cut the field this week.
Pulled
All electric wires i can pull are pulled. I need some framing done to finish anymore. I finished all the interior boxes for the baths except for the utility shower exhaust. I still need to run the 3 exhaust lines.
630a to 430p is 10 hours, but still not enough time in a day. I hate the weekend coming to an end.
630a to 430p is 10 hours, but still not enough time in a day. I hate the weekend coming to an end.
Outlets
On the inside of the house all that is left to wire is the office outlets.
I do have the garage, staircase junction boxes and flood lights left to be honest.
we went down at 830p and came back in at 1030p.
I am headed to bed to get the outlets and a little more done tomorrow.
I do have the garage, staircase junction boxes and flood lights left to be honest.
we went down at 830p and came back in at 1030p.
I am headed to bed to get the outlets and a little more done tomorrow.