I finally went out and worked at about 10 : 30. I came in at about 5 and took a shower. Not it is only going in 8pm but I am exhausted and an going to bed.
Attic
Sometimes I baffle myself. I was working about the plumbing all wrong. I have an Attic! I almost ran copper along the left and right and then zigzag back and fourth to avoid joists. With this mornings setback that stems from electrical overlook done last night, the thought of running up the middle and dropping to the legs and right as newest makes complete sense. I have the option of using small hot water heaters in the baths if needed. I also have an email out to the power company for an opinion on the 400 amp or duel 200 amp service. I can always stick with what I have and plan wisely. 🙂
Tomorrow is another day and we will are what it has to offer.
I know I have a presentation to give, yippee for me. I am looking forward to the weekend as here is so much to do.
I will be connecting all the wires wives wire nuts to verify the electrical is complete. Looks like Susan has a job and I might need to get Jose if he is available.
-Michael
Another day
Time to start working. Another day of work. I look forward to a day when I do not NEED to do anything. That way I do not feel guilty for just relaxing. 🙂 that day will come and hopefully in the near future.
Trim
Builder was out today and put a coat of paint on the trim. I asked about the caulking and he said he is caulking between coats. It makes me wonder if he was going to caulk at all.
I had to run and get more Copernicus pipes and will start the soldering of the copper tomorrow.
I had to run and get more Copernicus pipes and will start the soldering of the copper tomorrow.
Copper
Have the copper and start the plumbing tomorrow. We will see how it goes.