The eyes are itchy, my nose is runny and I really don't find any of this funny. Allergies are a pain and I look forward to this allergy season coming to an end.
Gutters
The gutters have been installed and the grout on the kitchen tiles has been completed. We can now install the appliances and plumbing fixtures at will.
I also removed and solders up the leaky pipe for the heat pump and turned the furnace back on.
Yippy. almost time to celebrate.
Electricity for the cold days
This is the electricity for the cold month in the quonset hut house ~ 900 SF.

This is the electricity for the cold month at the new house ~ 2500 SF. Of course there is nothing running besides the furnace. The house was set for 60 degrees. I look forward to seeing what the actual costs are once we are all in. J

Paint
The tile us laid, although not grouted. The paint touch up is done and the carpet can be laid on Friday.
I took a break by quitting early as advised, but it will take some getting. The guilt will diminish as I get in the habit of taking a break again.
I took a break by quitting early as advised, but it will take some getting. The guilt will diminish as I get in the habit of taking a break again.
Work
Went down and hung a curtain. Then worked on redoing the leaking water pipe. I cut out the elbow and put in 2 pipes, 2 couplings and and an elbow. After it cooled I tested it and there is a pinhole leak in one of the couplings
We measured the windows for shades and shut everything up and came up stairs.
We measured the windows for shades and shut everything up and came up stairs.