Arrived at 5he farm and was informed that the new water line had an end blow out. Grrr.
Feed
Was going to weed n feed the lawn tonight, but opted to wait with the rain chances.
Grass
We arrived home just after 5 today and I headded out to work on the lawn. I edged. popped some weeds and mowed the front lawn. I got in about 715.
Waterline
It’s been hellofa last few days.
Saturday we dug the trench, ok 90% of the trench before we ran out of light.
Sunday we finished the trench ends a started laying the almost 500 foot of waterline.
We started on attaching the couplings when we realized the Poly pipe sizes were not a match to the PVC. The poly pipe has a OD 2 1/8 and an ID 1 5/8.
Monday morning I found the 1 inch to 3/4 coupling OD fit the ID of the poly. At anout noon it was realized the walls are yoo smooth as the fitting came out.
By 3pm we found a barbed 1 1/2 fit and started applying them. The first one leaked so we cut it off and used PVC solvent and blue. We finished at 7pm and will test in the morning.
3 days of 8a to 7p has been tougher than I thought it would be.