The parents bathroom floor has been grouted and wiped. At 1:30 the tiles get the haze removed and in 3 days the can grout can be sealed.
one step closer.
Category: New House
Documentary of building the house
Floor
The last tiles have been put down in the parents bath. Next weekend we will grout that tile and only have marble and wood left to do for flooring.
Night
Saturday night is coming to a close. 🙁
It is only sad because a work day is almost upon us.
We did get some house things accomplished today and it was done at a leisurely pace. I hope to be able to work at this pace regularly as it really wasn't bad. I also didn't feel pressured, but am satisfied with the amount of items worked off.
Toilet
Forward
We have had some forward momentum today. Susan sealed the grout in the parents closet and toilet. I corrected the pocket door trim on the spare bath. We corrected the wiring in the fan lights in the parents bathroom. We only have the lights over the mirror left in their bathroom. I took a break and am going back to work on installing their bathroom toilet.