Well we are getting a little rain. I ran out between showers to do some work on the fence posts. It is going SLOW. I got the reference line in before the first shower and the second time I was able to drill a little over a foot. Only a little over one more to go. Then it will Be on to hole number two. 🙂
Made time to cut the grass today. The first brush pile is out, but the second one is still smoldering. So far it has been a productive day. I did read some work emails that upset me and I really would just put work aside when I leave on Thursdays so I have a more enjoyable weekend.