Marked the fence post line. It appears I need it more posts, which means I need to drill 8 more holes. luckily this includes the posts with the gate between the two pastures. Then since the weather was so nice I decided to take the trial and Tara the base of the steel buildings sense its load or stopped all the rain from leaking in. You just have to love tired no matter what you will always get it on your skin
Well its 848 and it's only 63 degrees so it should be a cool day. Headed to home Depot, the bank and then shopping before heading. Speech to text is sure great and i love it
We made it shopping and also stopped and closed out BoA accounts. I went over the finances one more time and everything appears to be in place. We should be OK through and after the building process.
They worked again today, the hole is deeper and much of the hole has been dug. I would say they are at least half done and now have a system. It is going faster now that they have their system in place.