About 3/4s of the rafters are completed.
Category: Daily Posts
My Personal daily whining, rants, complaining and worthless postings.
End
Interesting day. It concluded with our 4th flat tire in less than a year. This now makes all 4 tires have been damaged. This also takes them out of rotation as we needed new ones already before 40k miles and we are at about 43k.
we are wonder how long these 60k rated tires will last 🙂
-Michael
Sent via mobile.
we are wonder how long these 60k rated tires will last 🙂
-Michael
Sent via mobile.
Trench
I have the 600 feet of trenching complete. It took about 12 hours. I was going to connect and lay the pipes, but I am feeling the affects of the trencher and hope to be able to get them in before it rains. 🙂
Water line
Rented the trencher today for the water line. I need to have it back by 630PM tomorrow. I hope it goes good. I did a little as it got dark and think I may have the hang of it.
I will work on it as the sun rises tomorrow as I need the trencher returned by 630 PM tomorrow.
I will work on it as the sun rises tomorrow as I need the trencher returned by 630 PM tomorrow.
Upload
I still have neglected to upload photos.
The electrical boxes are in the sticks; I just need to install them in the foam.
I am picking up the trencher tomorrow to run the waterline and electric service line.
I wasted a lot of my day second guessing the breaker boxes.
The electrical boxes are in the sticks; I just need to install them in the foam.
I am picking up the trencher tomorrow to run the waterline and electric service line.
I wasted a lot of my day second guessing the breaker boxes.