This is the front entrance without the door installed.
Category: Daily Posts
My Personal daily whining, rants, complaining and worthless postings.
:(
The vacation is pretty much over. 🙁
I am down to just soldering our bathroom and the elbows to the compression fitting valves then I can pressure test. I ran out of solder today so I installed a few pipe supports and some disability bracing to mount the bathroom bars on.
I guess a quick game and off to bed. I need to play catch-up this week.
I am down to just soldering our bathroom and the elbows to the compression fitting valves then I can pressure test. I ran out of solder today so I installed a few pipe supports and some disability bracing to mount the bathroom bars on.
I guess a quick game and off to bed. I need to play catch-up this week.
Pillars
9
I decided to come in and stop for the day. I should be done this weekend or next and 9 hour days of work on my days off will now be the limit! I have a work plan that looks like this.
finish copper water in plumbing
pressure test then find and fix leaks.
Finish the electrical meter that had to be redone.
Finish the 2 inch water line (repair).
Finish the electrical in the house.
By this point the drywall should be started if not already done.
Cabinets should be in place.
Install the appliances.
Move in!!!
Contract the counter tops installation.
Prime all the drywall
Paint all the ceilings
Paint the rooms and set the fixtures in place
Cover the floors.
of course this order is subject to change. 🙂
finish copper water in plumbing
pressure test then find and fix leaks.
Finish the electrical meter that had to be redone.
Finish the 2 inch water line (repair).
Finish the electrical in the house.
By this point the drywall should be started if not already done.
Cabinets should be in place.
Install the appliances.
Move in!!!
Contract the counter tops installation.
Prime all the drywall
Paint all the ceilings
Paint the rooms and set the fixtures in place
Cover the floors.
of course this order is subject to change. 🙂
Soldering
Did some more soldering and most of the 3/4 pipe is complete.