Arrived in town at about 1pm. Popped weeds in the front and cut the grass in case of rain. Them popped weeds in the back, but did not mow. Came in and placed the orders for the parts to install the shop door.
Author: MGolen
Door
Saturday we started on the shop door project. A few hours of cleaning the shop and organizing. Then we measured and made plans to expand frame. Parts have been ordered and work should begin next weekend.
Spa
Was able to pop on the spa Saturday morning, but it was shorter than I expected. Again cold rain.
Spa
Friday night was the first time I used the new spa. Time flew and I came in due to cold wind and rain.
