17 August, 2020 20:16

Nice day. Cloudy and dry made it a great combination. I started with the graywater pump hole. Covered till electrical is installed, but still waiting on parts.

Installed some line extenders at the trees and covered the water lines better.

Then trenches the new line and grated the driveway.

All in all,finished about 130p. Was going to work on railing and inside electrical, but that didn’t happen.

Leave a Reply