Still waiting on the conduit for the wiring inside the spa.
Looks like we are going to visit crystal and the family tomorrow since the parts haven’t arrived.
Still waiting on the conduit for the wiring inside the spa.
Looks like we are going to visit crystal and the family tomorrow since the parts haven’t arrived.
We were able to finish the wiring for the spa. All that is needed is complete is the covering of the wires in the spa and the final connection in the spa. Also the final connection at the breaker box.
Look forward to energizing the power and filling the tub.
Maybe next weekend.
Looks like the mail posting has been broken since the 9th.
It looks like jetpack blew up. I think I have it fixed.
Not much done on Friday other than government work. Saturday it was cold out and caused a slow start. Dad and I were able to complete the electrical wring from the main panel to the Spa GFCI outside. The outside puncture has been sealed and only internal insulation needs to be completed.
Line from GFCI to spa need to be performed and the breaker box breaker moves. Then the spa breaker can be installed.
This weekend is to be cool and windy, but I believe we will do what we can weather permitting.