Not much done on Friday other than government work. Saturday it was cold out and caused a slow start. Dad and I were able to complete the electrical wring from the main panel to the Spa GFCI outside. The outside puncture has been sealed and only internal insulation needs to be completed.
Line from GFCI to spa need to be performed and the breaker box breaker moves. Then the spa breaker can be installed.
This weekend is to be cool and windy, but I believe we will do what we can weather permitting.