Waterline

It’s been hellofa last few days.  
Saturday we dug the trench, ok 90% of the trench before we ran out of light.  
Sunday we finished the trench ends a started laying the almost 500 foot of waterline.  
We started on attaching the couplings when we realized the Poly pipe sizes were not a match to the PVC.  The poly pipe has a OD 2 1/8 and an ID 1 5/8.  
Monday morning I found the 1 inch to 3/4 coupling OD fit the ID of the poly.  At anout noon it was realized the walls are yoo smooth as the fitting came out. 
By 3pm we found a barbed 1 1/2 fit and started applying them.  The first one leaked so we cut it off and used PVC solvent and blue. We finished at 7pm and will test in the morning.  
3 days of 8a to 7p has been tougher than I thought it would be.