My day consisted of cutting the grass around the tank and patching the driveway where there was a major rut.
Day: September 3, 2016
Solar
They came back out today as yesterday about 9 ish. They drilled the holes, they laid the pipes in the trench, they buried the trenchand they concreted the verticals pipes in place.
The concrete wasn’t dry so they didn’t cut the back pipes to the proper heighth.