Week

This concludes another week. OK it could also be the start of another week depending on when you start and end your week.
Anyway, I was able to get the fire pit burned today. It was a 6 hour project after lighting it. I kept the area around it watered and made sure it did not get out of hand. Now it is about 3-4 foot down from the top and smoldering ashes.
I have three outlets outside working so Jeff can work on the doors this week if he wants.
I ran up and took a shower and it reminded me of the month in the Mojave desert back in 1996 when showers were scarce. 🙂
I do love a shower daily!

Shower

Ran into a snag with the shower this weekend. After installing the Kedri membr on the shower walls I went to start the floor and was not positive what i was going to do was correct so I had to stop.
We ran shopping to get food and parts to finish Minolia 's sink drain. We Susan finished laying out the front stone walk. I finished Minolia's sink drain.
we then did some back filling by the house.
I just looked up what I need to do for the shower drain and I was correct, but learned I need unfortified thinset. So I need mortar and thinset to finish the pan to tile. The walls are ready and will be done once the pan is complete.