I went to the farm today to pickup some tools as it was less expensive than buying these again. I did get the three, eight foot shelves in and three clothes racks. This completes the closet storage, other than paint or covering them.
I will work on the three bathroom shelves and the 3 pantry shelves next time I am there.
I also found the heat pump to be making an awful noise and think it is not going to make it a year. I called the company and am working on seeing what they will do as it is under warranty.
Month: August 2011
class begins
Well, Susan left for work. She has class after work so she will probably be tired as she won’t be home until about 10:30. It is going to be a long couple of months.
I am headed out to the ranch, but will return today.
good night
I-|
Photos at the top
I think I need to put my own photos at the top and ditch the stock ones.
I also need to reduce the top white space and change the font and add the post time.
I guess there will always be something to do. =))
Something did go right
I worked on the bathroom floor tile. I was able to remove the loose tiles and prep for placement. I do not have the Grinder here so I could not prep the tiles. 🙁
I worked on the dishwasher. I was bale to get the bottom and wands to work properly, but the top still appears not to be spinning. 😐
Last I work on the tandem site. Photos and the store. I made great progress and like the results. I still have work to do, but other things must be worked on. 🙂
I plan to go to the ranch tomorrow. I believe I have meat pickup this weekend so I do not think I am staying there. I will pickup the tools I need and change the tire that is flat.